Product overview · Engineered equipment

Solid Brass Round Cabinet Knobs, 1-1/4 in. Diameter

Solid brass 1-1/4 in. round cabinet knobs in four finishes; retail packs and bulk cartons available.

Each product is configured around the required output, operating environment and site interface. Final dimensions, utilities and materials are confirmed against the approved product record and project requirements.

Share the application, required output and any fixed site constraints. We will return a reviewable configuration with the key technical and commercial inputs identified.

Product details

Specifications, documentation, packaging and product-specific options are loaded from the selected product record. Use the tabs to review the information that applies to this item.

Warm, Timeless Hardware

Machined from solid brass and hand-polished, these round knobs bring a classic feel to cabinet doors, drawer fronts, and case furniture. The substantial weight and smooth edges communicate quality that customers notice the moment they open a door.

Multiple Finishes, One Platform

Offered in satin nickel, polished brass, oil-rubbed bronze, and matte black, the knob accepts a standard 8-32 threaded insert and ships with mounting screws sized for typical 3/4 in. drawer fronts. Longer screws are available for thicker doors.

Key Specifications

Diameter: 1-1/4 in. Projection: 1 in. Base diameter: 15/16 in. Thread: 8-32 brass insert. Mounting screws included.

Bulk & OEM Supply

Supplied in retail blister packs or bulk cartons for OEM production runs. Contact us for finish samples, custom plating, and wholesale price lists.

Attribute Detail
Material Solid brass, machined and hand-polished
Knob diameter 1-1/4 in. (32 mm)
Projection 1 in. (25 mm)
Base diameter 15/16 in. (24 mm)
Thread 8-32 brass insert
Screws 8-32 x 1 in. machine screws included; longer lengths for thicker doors
Mounting hole Standard 3/16 in. drilled hole
Weight Approx. 1.6 oz (45 g) per knob
Finishes Satin nickel, polished brass, oil-rubbed bronze, matte black

From requirement to release for production

A documented engineering path takes the request from application review through configuration, documentation and factory acceptance, so the delivered unit can be checked against the agreed requirement.

Stage 01

Application review

We review the product application, required output, operating environment, interface constraints and any site-specific requirements before selecting a configuration.

Inputs confirmed before selection

Stage 02

Engineering selection

The selected model, materials, utilities and control scope are consolidated into a technical configuration that can be reviewed before production.

Configuration frozen for review

Stage 03

Documentation

Approved drawings, bill of materials, operating limits and inspection points are issued so the delivered equipment can be checked against the approved scope.

Documents issued before release

Stage 04

Factory acceptance

The finished unit is checked against the approved configuration before packing and shipment. Inspection records travel with the equipment.

Inspection record travels with the unit

Engineering review, documentation and inspection are handled as one connected release process. Final scope and values follow the approved product configuration.

Operating environments we plan for

Equipment can be configured around different duty profiles, operating environments and interface constraints. The examples below show the kind of application questions that shape the final configuration.

Images show representative equipment and operating environments. Final configuration follows the approved product record and project requirements.

Scope of supply

Export packing is specified for the equipment, transport mode and destination. Components are protected against handling and condensation, with lifting points and inspection marks identified on the packing list.

Documentation package

  • General arrangement drawing with skid footprint, weight and anchor points
  • P&ID with full instrument tag list
  • Single-line electrical diagram and terminal schedule
  • Utility schedule: power supply, feed water, drain and compressed air
  • EN 10204 3.1 mill certificates for all wetted SS316 components
  • Membrane element declaration of conformity
  • Pressure vessel design approval and hydro-test records
  • CE marking declaration and RoHS statement
  • Start-up and commissioning sequence, step by step
  • Normal operating ranges and alarm set-points
  • Consumable replacement intervals and maintenance schedule
  • Troubleshooting matrix mapped to HMI fault codes
  • Pre-commissioning checklist signed off at factory acceptance test
  • Performance test record: permeate flow, recovery, conductivity, SDI
  • Instrument calibration certificates for flow, pressure and conductivity meters
  • Recommended first-year spare parts list

Documentation is issued in the site language and can include native editable files for project review. The exact document set is confirmed with the order scope.

Send the requirement. We will confirm the configuration.

Product application, required output and any fixed site constraints are enough to start. An application engineer reviews the requirement and returns the relevant configuration, utility information and next technical questions.

Application engineering desk

Request a configuration review

Share the product, application and operating constraints. Each inquiry is reviewed against the actual requirement rather than a generic catalogue page.